Saturday, August 21, 2010

follow up - watch this space

We've vaulted the ceiling, demolished two of the interior walls, and put up a central wall to divide the two bedrooms. To save space a loft was built over the north wall (over the bedroom door). We will be demolishing the south wall interior and replacing the old wood windows with new and more efficient ones. It is still so hot that we will wait to do any more until the weather cools off. The room has sheet rock and electricity. The floor of the loft is about half decked with hardwood. There are two fluorescent lights. We will be covering the ceiling with the same cedar beadboard we used in the bathroom, and will install the ceiling fan and a ladder to the loft.

This weekend I will upload photos of the bedroom project.

We want to finish the bookcase frame before attaching the shelf track. First I'll sand the marks and other surface stuff, and then I'll put a clear varnish on the wood. There will be a lot of imperfections but it will be covered up by books so it won't be too visible.

No comments:

Post a Comment